How much is the Section 45 production tax credit (PTC)?

Internal Revenue Service

~$0.03/kWh (10 years)

Researched for this program: 5 rejection traps · 7 required documentsWhat decides this award ↓

The short version

About 3¢ for every kWh of renewable power you sell, each year for 10 years, if construction met prevailing wage and apprenticeship rules; 0.6¢ if it did not. A 10 MW wind farm selling 35,000 MWh a year earns roughly $1.05M a year.

A federal per-kilowatt-hour tax credit for electricity produced and sold from qualifying renewable energy facilities over a 10-year period beginning on the date the facility is placed in service. For facilities placed in service after 2021, the IRS rate for 2025 and 2026 is 0.6¢/kWh, multiplied by 5 to 3.0¢/kWh for facilities that meet prevailing wage and apprenticeship rules (or are under 1 MW). Open-loop biomass, landfill gas and trash earn half those rates. Domestic content and energy community bonuses add 10% each. Eligible technologies include wind, closed-loop biomass, open-loop biomass, geothermal, solar, small irrigation power, landfill gas, hydropower, and marine/hydrokinetic. Facilities cannot claim both §45 PTC and §48 ITC on the same property. §45 covers facilities whose construction began before 2025; facilities placed in service after 2024 can use §45Y, the technology-neutral successor, which now requires wind and solar projects to be placed in service before 2028 unless construction began within 12 months of the One Big Beautiful Bill Act.

Funding type
Tax Credit
Level
Federal
Amount
Facilities placed in service after 2021: 0.6¢/kWh base, or 3.0¢/kWh with prevailing wage and apprenticeship compliance (5x multiplier), per the IRS rates for 2025 and 2026. Half those rates for open-loop biomass, landfill gas and trash. Domestic content and energy community bonuses add 10% each. Rates adjust annually for inflation, base rounded to the nearest 0.05 cent. Facilities placed in service before 2022 earn 3.1¢/kWh for 2026 from wind, closed-loop biomass and geothermal. Credit runs for 10 years from placed-in-service date. Facilities placed in service after 2024 can use §45Y (Clean Electricity PTC) at the same per-kWh rates.
Realistic amount
A 10 MW wind farm producing 35,000 MWh/year with prevailing wage compliance earns approximately $1,050,000/year (35,000,000 kWh × $0.030/kWh), or $10.5M over the 10-year credit window. A 1 MW solar facility producing 1,500 MWh/year earns approximately $45,000/year ($450,000 over 10 years).
Deadline
Claimable each year for 10 years on facilities that began construction before 2025; no new-facility application window
Status
active
States
Nationwide
Payment model
tax offset

Who qualifies

What people ask next

Who can claim the Section 45 production tax credit?

The owner of a qualifying renewable power facility that sells its electricity to an unrelated buyer, if construction began before 2025. Eligible sources are wind, closed-loop and open-loop biomass, geothermal, solar, landfill gas, trash, hydropower, and marine and hydrokinetic energy. Power you use yourself does not count. The owner files IRS Form 8835 each year of the 10-year credit period; partners and S corporation shareholders usually report their share directly on Form 3800. Businesses, cooperatives, tribes, cities and nonprofits can all own a qualifying facility.

Can a new wind or solar project still get a production tax credit?

Only through Section 45Y, and only if the project is placed in service before 2028 or began construction within the One Big Beautiful Bill Act's 12-month window. That window has passed, so a wind or solar project starting construction now has to be in service before 2028. Section 45 itself takes no new projects: it covers facilities whose construction began before 2025. Section 45Y pays the same per-kWh rates for facilities placed in service after 2024. For most wind and solar projects, only physical work of a significant nature counts as starting construction. Rules for 45Y are on the Section 45Y page.

Is the production tax credit or the ITC worth more?

It depends on how much power the project makes per dollar it costs: high-output projects such as wind usually do better with the PTC, expensive low-output ones with the ITC. The PTC pays about 3¢ per kWh sold for 10 years. The ITC is a one-time credit on the project’s cost: under Section 48E, 6% base, or up to 30% with prevailing wage and apprenticeship. You claim one or the other on the same property, never both. A 10 MW wind farm selling 35,000 MWh a year earns about $10.5M in PTC over 10 years; compare that with 30% of its build cost. The ITC calculator runs the other side.

Can you sell the production tax credit?

Yes: under Section 6418 an owner can transfer all or part of the credit to an unrelated buyer for cash, at a price the two negotiate. Tax-exempt organizations, states, cities, tribes and rural electric cooperatives can instead take it as a direct payment under Section 6417, for facilities placed in service after 2022. For-profit owners cannot take direct pay for Section 45; for them, elective pay is limited to the 45Q, 45V and 45X credits. Either route needs an IRS pre-filing registration for each facility before the return is filed.

How long does the credit last?

10 years from the date the facility is placed in service, claimed each year for the electricity sold that year. The credit follows production, not construction cost, so a facility that runs less earns less. The IRS resets the rate each year for inflation in the Federal Register; for facilities placed in service after 2021 it was 3.0¢/kWh with prevailing wage in both 2025 and 2026. The credit shrinks only if market power prices rise above an inflation-adjusted 8¢ threshold, and the IRS found they did not for 2026.

What it covers

Eligible expenses

  • Electricity produced from qualifying energy resources listed in §45(c) — credit is based on production output, not capital costs
  • Qualified hydropower: incremental output increases at existing hydro facilities from efficiency improvements also qualify
  • The credit applies to kWh metered and sold to an unrelated utility, grid operator, or power purchaser

Ineligible expenses

  • Electricity consumed by the facility owner (self-consumption doesn't qualify — only electricity sold to unrelated persons)
  • Electricity from facilities that also claimed §48 ITC on the same property (mutual exclusivity election applies)
  • Production from wind facilities experiencing phase-down reductions based on construction start date (wind placed in service before 2022 may receive reduced credits)
  • Electricity produced from fossil fuel combustion (coal, oil, natural gas, propane)
  • Open-loop biomass produced from municipal solid waste co-fired with fossil fuels beyond allowed ratios

How to apply

  1. 1

    Select PTC vs ITC (§45 vs §48) and facility structure

    Determine whether §45 PTC or §48 ITC maximizes value for your project. PTC favors high-capacity-factor facilities with long operating lives (wind, geothermal); ITC favors higher-capital-cost, lower-output facilities (solar, storage). Cannot claim both on the same facility. Model cash flows across the 10-year window for each option.

    ~8 hrs

  2. 2

    Confirm construction start, placed-in-service date and statute (§45 vs §45Y)

    Verify when construction began and when the facility was placed in service. §45 covers facilities whose construction began before 2025; facilities placed in service after 2024 can claim §45Y instead, at the same per-kWh rates. For wind and solar, §45Y requires the project to be placed in service before 2028 unless construction began within 12 months of the One Big Beautiful Bill Act. For older wind projects (placed in service before 2022), check whether the construction start date triggers a phase-down.

    ~3 hrs

  3. 3

    Implement prevailing wage and apprenticeship compliance

    Obtain Davis-Bacon prevailing wage determinations for the project county from the Department of Labor. Require certified payroll from all construction contractors and subcontractors. Monitor apprenticeship ratios throughout construction. Without compliance, the credit drops to approximately 1/5 of the full rate.

    ~15 hrs

  4. 4

    Elect direct pay or plan credit transfer structure

    Tax-exempt entities and government bodies file elective pay election. For-profit project owners assess whether to retain credits, transfer them, or use a tax equity partnership structure (the traditional pre-IRA approach for developers lacking tax appetite). Credit transfers under §6418 provide immediate liquidity at approximately 90–96 cents on the dollar.

    ~10 hrs

  5. 5

    Track production, file Form 8835 annually for 10 years

    Metered electricity production records are required for each tax year throughout the 10-year window. Complete IRS Form 8835 (Renewable Electricity Production Credit) annually. Credit is earned in the year the electricity is produced and sold — not when the facility is built.

    ~6 hrs

Industry & certifications

NAICS codes: 221114, 221115, 221116, 221117, 221118

Insider tip

The PTC vs ITC decision is project-specific — model both. Wind typically favors PTC (high capacity factor, 10-year window outperforms 30% upfront ITC). Solar has historically favored ITC but PTC can win for utility-scale projects. Never assume ITC wins for solar without modeling.

Deadline & timing

§45 and §45Y use the same per-kWh rates and credit mechanics. The distinction matters for compliance and for which projects still qualify: §45 needs construction to have begun before 2025, and §45Y now requires wind and solar projects to be placed in service before 2028 unless construction began within 12 months of the One Big Beautiful Bill Act. Wind facilities placed in service before 2022 may face phase-down reductions (20–60%) depending on when construction started. Biomass facilities have a 5-year credit window instead of 10 years for certain configurations.

Get one email if this program changes

GrantCompass tracks Renewable Electricity Production Tax Credit (Section 45 PTC) in the live catalog. Leave an email and we’ll tell you if it sets a deadline, changes its terms or closes.

Free. One email when the window moves, deadline warnings on your watchlist, and the monthly closing-soon digest. Unsubscribe anytime.

Programs that stack well

Related programs

This program is not taking applications today — these are

Alternatives computed from the live GrantCompass catalog on November 1, 2026 — all 170 open grant programs · filter the database.

Explore more funding

Last updated October 30, 2026. GrantCompass is an independent funding-discovery tool and is not affiliated with any government agency. Always confirm details on the official program page.